Skids
We have more than 15 years of experience in SKIDS construction and solutions for the food, chemical and oil and gas industries, we have a high technical profile team to satisfy the client's specific needs and provide a comprehensive solution.
​
Site process evaluation to define type and technology
Preparation, mixing and batching
Measurement, regulate flow
Filtration
Addition
​
Design
Fully customized according to engineering requirement.
​
Standards:
ASME VIII-2 (Division 2) / NOM-020-STPS-2011
Definition of capacity, general arrangement and engineering detail
PFD'S & P&ID'S
Process simulation
2D and 3D modeling/simulation
quality plan
of construction
According to the applicable codes, we design a protocol to plan quality:
Weld inspection.
Material certificates.
Geometric Tolerances.
Material roughness tolerances for clean design.
construction
During the construction process we have AWS certified welders.
​
We implement the construction quality plan to ensure the design specifications required for the application.
delivery
Once the equipment is finished, we submit the necessary additional tests that our clients require.
​
Upon accepting the equipment we will immediately ship the equipment on specialized transportation.
​
If necessary, we also have all the infrastructure to put it in place.